Pictures and description of work done in 2013

Pictures of the year 2013

January – April: A new house next to the vegetable garden was built.
May: The new house was used but still missed electricity, paint and a sub ceiling with insolation.
December: Finalisation of the house and concreting of the outside area. We also renovated a front and a side outside wall as well as an inside wall which had been damaged due to heavy rain.